How the Plan developed

The Altrincham Town Centre Neighbourhood Business Plan is effective from 2015 – 2030. The creation and adoption by Council of a Neighbourhood Plan needs to go through four separate stages. These stages are listed below, together with the timeframes for the Altrincham Plan.

 

Mid-October 2014 – Mid-November 2017

  1. Public consultation, Stage One: defining the issues and gathering the facts in conjunction with local community (mid-October – mid-November 2014)
  2. Public Consultation Stage Two: engaging local community in discussion and receiving feedback on draft proposals (February – March 2015)
  3. Public Consultation Stage 3: gathering comments and feedback on final proposals (mid-January – mid-February 2016). The final Plan, together with the Basic Conditions Statement and The Consultation Statement was submitted to the Council for review.
  4. The Council reviewed the documents to ensure that it (i) met the requirements of the Localism Act 2011, (ii) to appoint an independent examiner to confirm the process for creating the plan had been correctly followed (iii) to advertise the plan for 6 weeks and conduct public referenda, one for local businesses and one for the general Altrincham Public (June 2016 – October 2017). N.b. this timeframe reflects local council elections which happened part way through this period.

The documents produced to support the above process can be found here:-

  1. The Consultation Statement can be found here:- Consultation Statement
  2. The Neighbourhood Business Submission Plan can be found here:- Submission Plan
  3. The Supporting annex to the plan can be found here;- Supplementary annex to the plan
  4. The Basic Conditions Statement can be found here;- Basic Conditions Statement
  5. Independent Assessors Report can be found here;- http://www.trafford.gov.uk/Planning/strategic-Planning/docs/07022017/Altrincham-NBP-Final-Report.pdf.

 

Following a positive result from both referenda, the Council adopted the Altrincham Neighbourhood Business Plan, which will thus run from October 2017 – 2030.

How the Plan developed

Projects

Tabley Court

Remodelling of existing office building to create new feature entrance

Read More »
Altair Phase Two

Altair Phase Two

New build retail, office leisure use plus 85 apartments to upper floors, public realm landscaping

Read More »
Altair Phase 1

Altair Phase One

New build ground floor retail and reconfigured entrance to existing ice rink, 59 new build

Read More »
Bistro Pierre

65-67 George Street – Bistro Pierre

Conversion of retail unit to restaurant with new windows and shopfront

Read More »
61-63 Stamford New Road

61-63 Stamford New Road

Conversion and rear extension of historic former bank to ground floor café and upper floor

Read More »
16-24 The Downs

16-24 The Downs

Demolition of existing buildings for four new build town houses, six new build apartments and

Read More »